Moving a Factory? Contact Equipment Movers in Fort Worth

by | Aug 14, 2013 | Moving Services

Recent Articles

Categories

Archives

Moving a factory is a complicated and time-consuming process. It requires Equipment Movers in Fort Worth that have a wide range of skills. It involves millwrights, riggers, laser technicians and craters to successfully move the large pieces of equipment. The movers will have to coordinate with the factory’s production manager to ensure that all of the equipment is moved in the proper order. Engineers will determine the best place in the equipment to separate machinery.

Craters will then work with the to ensure that each piece is boxed appropriately. The shape will be matched as closely as possible and strong padding will be used to protect arms and other projecting features. Every glass dial will be covered and protected from scratches. If the machinery is being shipped to Europe or China the craters and movers have to be aware of every regulation that needs to be followed.

Even if the move is only to another industrial plant in Texas, that still could mean that the large loads have to travel on interstate highways through several counties and cities. The transport crews from the Equipment Movers in Fort Worth company will have to know how high and wide the load is and the capacity of all roads, overpasses, underpasses and bridges. It is not acceptable to find out at the last minute that the load cannot travel under a low overpass.

The equipment should also arrive in the order that it is going to be re-assembled. Therefore no time will be lost waiting for a missing piece to arrive. The factory plant manager and the project manager from the Equipment Movers company in Fort Worth will oversee the unpacking as a team. Then the movers will take the equipment out of the crates and move it into position. Machinists and engineers will make sure that it is working properly and place it in its proper location. As the adjacent piece arrives welders will be ready to reconnect the equipment.

Everything will be re-calibrated to ensure that it is as accurate as before. Detailed checklists will ensure that nothing is lost or put in the wrong location. The plant will be up and running as soon as possible.